During November 6-9 we got 5 sites around Hekla up and running. The monuments were already installed last spring and in this trip we installed the wind generators and the receivers (all NetRS). The sites need to be visited once more to install the communications. The sites installed were MJSK, GLER, NORS, HEKR and HESA (see map). We also installed a monument at BRDK, but that site is (at the moment) planned as a semi-continuous site. A monument was installed at HAUK last week by Þorgils and Judicael. Pete will post the details for each site in the next few sites as he was the photo master of the trip (along with doing the drilling and carrying all the heavy stuff!).